Construction


Previous | Up | Next

Showing 1-8 of 8

Sample image from gallery

1 - First Work Party, July 1, 2007

Finally breaking ice on the Ice-Flo project.

14 images

View Slideshow

Sample image from gallery

2 - Upward Construction Continues, July 14-15, 2007

Further upward construction and white paint for protection and a snowy look

7 images

View Slideshow

Sample image from gallery

5 - Structure finished, top built, fabric panels finalized, July 28-29, 2007

Tons of work finished this round, including finished top perimeter, wire guides, more structural finishing bits, and final fabric panels designs. Excellent work, crew!

48 images

View Slideshow

Sample image from gallery

8 - Nears Completion, August 12, 2007

The van was completely covered (more or less)! Plus, many fine details were wrapped up including the carpeting and other fabric bits on benches, white speaker condoms, a sub-woofer was procured, and the DJ bar is largely done.

22 images

View Slideshow

Sample image from gallery

6 - Big Weekend for Lots of Detailed Work, August 5, 2007

Finished the deadly panels and mounted speakers plus some padded benches. Also Skye and Bryce started work on the blue acrylic paneled audio rack cabinet and DJ Bar!

17 images

View Slideshow

Sample image from gallery

7 - Gettin' All Loungy, August 9, 2007

We’ve now got plushie carpets, icy pillows, and couches, plus Skye begins installing the acrylic DJ bar and Joe makes his van all funny!

13 images

View Slideshow

Showing 1-8 of 8

Interesting Links
Description:
Shots of the Ice-Flo surfacing
Viewed:
129 times

All rights reserved. Images may not be reproduced in any form without the express written permission of the copyright holder.
Powered by singapore | Log in